Refurbishment of new wing office spaces, levels 1, 2 & 3 and refurbishment of the ground floor to create gallery/retail/restaurant spaces, including category b fit-out of the new 3rd floor wing.
New build & full refurbishment, alterations and extension
Demolition of an existing building for the replacement of a four storey mews house with basement and material change of use of the existing building to form 5 No two bedroom self-contained flats and 1 No two bedroom top floor maisonette flat, including new mansard roof, internal structural alterations, full refurbishment and rear infill extension.
Full refurbishment
Alterations and full refurbishment, including leisure suite, restaurant, bar and back of house at the Marriott Hotel, Park Lane, London.
Full refurbishment & roof extension
Internal alterations / refurbishment and a material change of use to form 107 rooms for student accommodation, including roof extension to create new eigth floor, external fire escapes, shop / commercial space on ground / lower ground floor levels and ancillary areas.
New office fit out
Internal alterations and full refurbishment consisting of a new office fit out to a Grade II listed building in London.
Barn conversion
Material change of use of two existing detached two Grade II buildings (dairy block and barn) to form new chapel, wedding reception and function hall, including commercial kitchen.
Alterations and full refurbishment
Material change of use of a Grade II listed former hospital to form 76 self contained apartments for student accommodation.
Full refurbishment, extension and internal alterations
New single storey rear extension with “green roof” and internal (structural) alterations to form a new kitchen/living room with vaulted ceilings, new ground floor home office and ancillary rooms, new spiral staircase to first floor and full refurbishment of a Grade II listed cottage, including controlled services, new thatched roof and the construction of a detached habitable outbuilding with garage.